Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Algeria wildfires kill 12 and injure 54 amid severe heat

    August 27, 2026

    South Korea tourist arrivals reach 2.09 million in July

    August 26, 2026

    Air Arabia sets December start for Sharjah Gdansk route

    August 26, 2026
    Facebook X (Twitter) Instagram
    News MoxiNews Moxi
    • Automotive
    • Business
    • Entertainment
    • Health
    • Luxury
    • Lifestyle
    • News
    • More
      • Sports
      • Technology
      • Travel
    News MoxiNews Moxi
    Home » ADNOC Drilling awarded $2 billion for the Hail, Ghasha Development Project
    Business

    ADNOC Drilling awarded $2 billion for the Hail, Ghasha Development Project

    July 27, 2022
    Facebook Twitter Pinterest LinkedIn Tumblr Email

    In connection with the Hail and Ghasha Development Project, Abu Dhabi National Oil Company (ADNOC) announced the award of two large contracts totaling $2 billion (AED7.49 billion) to ADNOC Drilling. A total of $1.3 billion (AED4.89 billion) will be spent on integrated drilling services and fluids, and $711 million (AED2.6 billion) will be spent on providing four Island Drilling Units. ADNOC Logistics & Services was also awarded a third contract for offshore logistics and marine support services valued at $681 million (AED2.5 billion).

    ADNOC Drilling awarded $2 billion for the Hail, Ghasha Development ProjectIn total, more than 80% of the awards will flow back into the UAE’s economy as part of ADNOC’s successful In-Country Value (ICV) program. Each of the three contracts covers the Hail and Ghasha drilling campaign for a maximum of ten years. This project is part of the Ghasha Concession, which is the world’s largest offshore sour gas development and an important component of ADNOC’s integrated gas masterplan as well as an important enabler of UAE gas self-sufficiency.

    With the expansion of ADNOC’s liquified natural gas (LNG) capacity, ADNOC’s gas masterplan ensures a sustainable and economical supply of natural gas to meet the growing demands of the UAE and international markets. As part of the plan, new approaches and technologies will be applied to increase and improve gas recovery from existing fields, as well as develop untapped resources and leverage innovation to reduce emissions over time.

    Natural gas production from the Ghasha Concession is expected to begin around 2025, ramping up to over 1.5 billion standard cubic feet per day (SCFD) by the end of the decade. A total of four artificial islands have already been completed, and development drilling is underway. As part of the Ghasha Concession, ADNOC and its partners awarded two Engineering, Procurement & Construction (EPC) contracts last November. For the Hail and Ghasha project, they also awarded a contract for updating Front-End Engineering and Design (FEED). By the end of the year, the updated design will further optimize costs and timing, as well as potentially accelerate carbon capture integration.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Oil prices rebound after Brent slides below $93

    August 25, 2026

    Alibaba secures HK$80 billion to expand AI investment

    August 24, 2026

    South Korea launches Arctic container ship trial to Europe

    August 24, 2026
    Latest News

    Algeria wildfires kill 12 and injure 54 amid severe heat

    August 27, 2026

    South Korea tourist arrivals reach 2.09 million in July

    August 26, 2026

    Air Arabia sets December start for Sharjah Gdansk route

    August 26, 2026

    European Commission adds PCR support for Ebola outbreak

    August 25, 2026

    Oil prices rebound after Brent slides below $93

    August 25, 2026

    Alibaba secures HK$80 billion to expand AI investment

    August 24, 2026
    © 2023 News Moxi | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.